Weekly Traffic Advisories – Government of Nova Scotia, Canada


CONTINUOUS WORK


ANNAPOLIS COUNTY: Chute Road, Upper Granville
Chute Road is closed for upgrade from 7 a.m. to 7 p.m. weekdays until July 25.

Emergency vehicles will still be permitted access to the road, and other vehicles will have access on weekends and weekdays from 7 p.m. to 7 a.m. The detour is Inglewood Road to Clarence Road.


ANTIGONISH COUNTY: Highway 104, James River

Route 104, westbound lane approximately one kilometer west of the James River Interchange, exit 30, is reduced to one lane for approximately one kilometer.

Twinning work continues until 2023.

Signs are in place and drivers are urged to exercise caution.


CAPE BRETON REGIONAL MUNICIPALITY: Mira Gut Bridge, Mira Gut

Due to construction work on the Mira Gut Bridge, Mira Bay Drive from Brickyard Road to Mira Gut Lane is restricted to local traffic only.

Access to the beach parking lot and washrooms will remain open during construction.


CAPE BRETON REGIONAL MUNICIPALITY: Salmon River Bridge, Grand Mira Nord

The Salmon River Bridge on Intervale Road will be closed for repairs until July 29.

The detour is on Grand Mira North Road.


COLCHESTER COUNTY: Burnett Bridge

The Burnett Bridge, over MacLean Creek on Highway 224 in Pine Grove/Gays River, is closed until further notice.

Detour signs and a 30 tonne weight restriction are in place. All other trucks must follow the posted route. The detour is via Saint Andrews River Road.


COLCHESTER COUNTY: Old Truro Road, Tatamagouche

Old Truro Road from the Kennedy Hill intersection to Cross Road in North River is closed until further notice due to a major culvert failure.

A diversion is in place.


COLCHESTER COUNTY: Salmon River Bridge, Truro

The Salmon River Bridge, on Route 101 between exits 14 and 14A, will be reduced to one lane northbound, until October 31, due to planned work on the bridge deck.


COLCHESTER COUNTY: Slade Road, Tatamagouche

Slade Road is closed between Lake Road and West Tatamagouche Road until further notice due to a bridge closure.


GUYSBOROUGH COUNTY: Route 344 (Main Street), Mulgrave

Traffic on Route 344/Main Street is being redirected to the newly installed detour bridge. The Mill Street entrance from Main Street is closed and drivers must take an alternate route. Signs are in place.

The diversion will remain in place until August 31.


GUYSBOROUGH COUNTY: Trunk 16

Trunk 16, 1.4 miles north of the Lincolnville Loop, north to Mattie Road, will be reduced to one lane for brush clearing and roadwork until August 31.

Traffic control is on site. Work takes place on weekdays from 6 a.m. to 8 p.m.


HALIFAX REGIONAL MUNICIPALITY: John Brackett Drive, Herring Cove

John Brackett Parkway will be reduced to one lane until Wednesday, July 13. Traffic control is on site. Work will take place from 9 a.m. to 4 p.m.


HALIFAX REGIONAL MUNICIPALITY: Ketch Harbor Road, Herring Cove

Ketch Harbor Road will be reduced to one lane until Wednesday, July 13. Traffic control is on site. Work will take place from 8 a.m. to 5 p.m.


HANTS COUNTY: Highway 101, Windsor

The eastbound exit ramp at Exit 6 Route 101 is closed for construction of a new interchange to downtown Windsor.

A detour is available via exit 5A. The exit ramp will be closed until September 2023.


HANTS COUNTY: Hydes Bridge, Lantz

The Hydes Bridge on Highway 277 is closed until further notice.

A detour is in place via Dutch Settlement Road, Elmsdale Road and Trunk 2. Signs are in place.


INVERNESS COUNTY: Orangedale

Orangedale-Iona Road, from Portage Road southerly for approximately 5.7 kilometers, will be reduced to one lane for gravelling and drainage work until July 31.

Traffic control is on site. Work takes place on weekdays from 6 a.m. to 6:30 p.m.


LUNENBURG COUNTY: Indian Path Bridge, Bayport

The Indian Path Bridge, Route 332, is closed for replacement until October.

A diversion is in place.


PICTOU COUNTY: East River West Side Road, Eureka

The section between 6280 East River West Side Road and Churchville Road will be closed until October 31 for the replacement of the Eureka Mills Bridge.

A diversion is in place.


PICTOU COUNTY: Route 289 (Little Harbor Road)

Route 289 (Little Harbor Road), from the northern New Glasgow town limit to Route 348, is reduced to one lane for paving and patching until August 31.

Traffic control is on site. Work takes place on weekdays from 6 a.m. to 8:30 p.m.


PICTOU COUNTY: Westville Road

Westville Road at the Westville Road Bridge over Highway 104 will be closed nightly, Sunday through Thursday, 7 p.m. to 6 a.m.

Work continues until August 31. A detour will be in place and motorists should proceed with caution.


QUEENS COUNTY: Peterson Falls Bridge, Westfield

The Peterson Falls Bridge on Westfield Road will be closed for deck replacement until August 5.

A diversion is in place.


RICHMOND COUNTY: Port Royal Bridge, Isle Madame

The Port Royal Bridge on Port Royal Road is closed until further notice. A detour is in place on MacEachern Road.


RICHMOND COUNTY: Trunk 4

Trunk 4, from Riverside Road easterly for approximately 7.1 kilometers, will be reduced to one lane for repaving until September 30.

Traffic control is on site. Work takes place on weekdays from 6 a.m. to 6:30 p.m.


SHELBURNE COUNTY: Highway 103, Jordan Falls

Highway 103, about 100 yards west of Exit 24, will have alternating lane closures for Jordan Falls Bridge rehabilitation work until August 31.

Traffic lights are in place. Work takes place on weekdays from sunrise to sunset.


YARMOUTH COUNTY: Lake George Road, Lake George

Lake George Road from Richmond Road to Crosby Road is closed alternately for roadwork until August 31.

Signs are in place and traffic control is on site. Work takes place on weekdays from sunrise to sunset.


YARMOUTH COUNTY: Lakeside Road, Yarmouth

Lakeside Road from Main Shore Road to Dayton Road is reduced to one lane for paving until August 31.

Traffic control will be on site. Work takes place on weekdays from sunrise to sunset.


YARMOUTH COUNTY: Main Shore Road, Yarmouth

Main Shore Road, from Darling Lake Road north approximately two kilometers, is reduced to one lane for ditch and culvert work until August 31.

Traffic control will be on site. Work takes place on weekdays from sunrise to sunset.

-30-


Gb8

Back to top button